Overground

East London Line

Opened on December 7th 1869 as the
East London Railway
operating between
Wapping and New Cross Gate.

Now absorbed into the Overground network.
Underground trains no longer run over this line and
the connection at St. Mary's Junction has been severed.

 

Signal Boxes / Cabins

 

Image Comments Details
Shoreditch Slave frame and diagram.
Levers are air worked from push buttons in
Whitechapel signal cabin.
Colour
31kb

 

Control Rooms

 

Image Comments Details
     

 

Other Images

 

Image Comments Details
Shoreditch A60/62 stock New Cross Gate train
just arrived in Shoreditch platform one.
Colour
42kb

 

RAINBOW.GIF (3014 bytes)

Back to Photo Album

Go back to Photo Album page

RAINBOW.GIF (3014 bytes)